twinos

The Energy Layer Your SCADA Was Never Built to Be — An EMS for Industrial Plants

twinos

Your Plant Already Has Meters. You Still Can't Answer the Board.

METERS70 devicesModbus · 61850SCADA TAGSflat, process-centricEXCEL EXPORTevery Fridayby one engineerPowerBIrefresh failedagainBOARD ASKS₹/kWh by line?BRSR number?DSM exposure?The data exists. The evidence doesn't.
02 / 10
twinos

SCADA Was Built for the Process. twinos Is Built for the Electrons.

SCADA LAYERthe process, not the record· Interlocks, alarms, trips· Batch sequencing, recipes· Operator HMI screens· Sub-second control loops· Vendor-locked tag modelsStays. Does its job. Untouched.TWINOS LAYERthe record, not the process· Energy accounting by topology· Shift-aware rollups· Cost & tariff attribution· Power-quality evidence· Auditor-grade artifactsNew layer. Runs alongside.
03 / 10
twinos

Topology-Native, Protocol-Native, Shift-Native — From Line One.

MODBUS TCPIEC 61850…add more adaptersUNIFIED SAMPLEtopology · shift · PQ · cost tags3 INCOMERS6 TRANSFORMERS21 FEEDERS40 MOTORSROLLUPS ARE STRUCTURAL — NOT AGGREGATED AFTER-THE-FACTSHIFT AS A DIMENSIONA · 06-14B · 14-22C · 22-06timezone-aware · overnight-safe
04 / 10
twinos

Bus Balance Is Not a Report. It's a Model.

The question your lender, your auditor, and your plant head all ask the same way: "of the electrons the incomer brought in, where did they go — and does it add up?" Your SCADA tag list does not know what an incomer is. It knows a tag called RMU_01_P. Excel can't fix that.

INCOMER IMPORT6,108 kW3 incomers33 kV busFEEDER CONSUMPTION5,956 kW21 feedersLV busDELTA2.5 %152 kWTX + cable lossesSCADA's tag list doesn't know "incomer" means something different from "feeder." twinos's data model does.
05 / 10
twinos

Reports Are Templates. Audits Are Artifacts.

TEMPLATE (JSON)· bus_balance_monthly· transformer_loading_weekly· feeder_shift_daily· motor_shift_daily· power_quality_daily· cost_demand_monthlyGENERATEtime-series query+ tariff + topologyPDF ARTIFACT· bus balance ✓· losses reconciled· shift split· ₹ per meter· PQ events logged· audit-hash pinnedJSON ARTIFACTmachine-readablediff-able, reproducibleNine report templates ship out of the box. Each one is a version-controlled JSON file, not a re-built HMI screen.
06 / 10
twinos

Where twinos Sits. And Why Nobody Else Does.

The competition isn't another EMS vendor — it's the quiet cost of stitching five tools and one engineer together every month. And even the vendors who do sell you an EMS don't put all five capabilities in one layer.

CapabilitySCADA + Glue Code (what you have)Other EMS Vendors (what the market sells)twinos
Dual-protocol native (Modbus + IEC 61850)Custom tag-mapping glueUsually pick one✔ Native · one service
Topology-aware rollups (bus balance)Excel approximation · brittleFlat meter list✔ First-class data model
Shift as a dimensionCASE WHEN · breaks on DSTCalendar-only reports✔ Timezone-aware · overnight-safe
Power quality + cost in one recordTwo pipelines · never in syncPQ sold as separate module✔ Unified sample stream
Reports as versioned JSON templatesBespoke Excel every monthClosed report-builder or HMI✔ Diff-able · reproducible
Auditor · lender · BRSR-grade evidenceUnreproducibleDisclosure-grade at best✔ Covenant-grade
07 / 10
twinos

Single-Line Diagram

The plant — one screen. Topology you can click. 70 meters, 4 tiers, live kW on every branch.
08 / 10
twinos

Fleet Heatmap

70 meters. One glance. No glue code. Plant-wide KPIs up top, drill-down by asset class below.
09 / 10
twinos

Deploy. Pilot. Scale. — Let's Talk.

What a Pilot Looks Like

  • Week 1 — Topology + tariff configuration, edge adapter on one transformer bay
  • Week 4 — First 10–15 live meters streaming into twinos, first shift reports generated
  • Week 12 — Full plant fleet on twinos, reports automated, glue-code pipeline decommissioned
  • Runs in parallel with SCADA throughout — zero disruption to the process layer
  • Deliverables: topology model, report templates, trained operators, 12 weeks of live evidence in the archive

Contact Us

  • [ Primary Contact Name · Title ]
  • [ info@lesgroup.in ]
  • [ +91 #### ### ### ]
  • [ www.lesgroup.in ]
  • Live demo — this deck is running on our own simulator at http://localhost:8600
  • Next step — a 60-minute call + a 2-hour topology walk-through of your plant
10 / 10